国产精选在线视频第二页_日韩Av一二三区_国产无套水多在线观看_日本综合亚洲三级_免费欧美在线视频_变态黄色网站在线观看_欧美日韩天天精品_网名三级片亚洲无码_一级真人片a女人刺激视频免费_在线视频欧美日韩一区

Welcome to [Kunshan Guangcheng Industrial?Products?Co.,?Ltd.] official website!
LANGUAGE:CNEN

Contact:MR HUANG

+86-13816679578

Specific operation steps of the pin

1. Stop the pumping unit crank at the 45-60 ° position on the upper right, apply the brakes firmly, hold the polished rod with a polished rod clamp, sit on the packing box, and remove the load.
2. Remove the connecting rod and crank pin bearing seat, pull out the split pin, remove the crown nut, remove the crank pin from the crank hole, clean the crank hole and apply butter.
3. Remove the bearing cover brake washer and round nut, smash out the old crank pin, install the new crank pin, tighten the nut, brake washer and bearing cover, and inject butter.
4. Put the new liner into the crank stroke hole, and then install the new tip. After installing the key, place the compression washer and the crown nut.
5. Connect the connecting rod and tighten the crown nut. The compression washer should maintain a gap of 4-10 mm from the end face of the crank hole, and install the cotter pin.
6. Loosen the brake and reel the oil pumping unit, let the donkey head hang on the load, and remove the bare rod clamp on the packing box.
7. Open the pump to check the installation quality.
2020/02/20 16:03:40 2556 CLICK

SCAN WEB SITE

Contact : MR HUANG +86-13816679578

Telephone : +86-512-57270860

Website : aoyu2010.cn

E-Mail : Huanghenry77@163.com

Address : Room 6, Building 32, Federal International Garden, Kunshan City, Jiangsu Province

Copy right ? 2020 Kunshan Guangcheng Industrial?Products?Co.,?Ltd.